Vlerësimi i filmit
0 vota

Episode

1979 - This Old House

S13E08 The Wayland House - 8

Our master carpenter completes the radius frame for the front portico deck, while our general contractor reviews the new engineered wood framing for the kitchen and master bath. Excavator Herb Brockert begins digging the leaching field for the new septic system. Asbestos is removed from pipes in the basement.

  • Postera

  • Backdrops

  • Linke interesante

  • Fragmente

Emri i publikimit