Filmaren maila
251 bozak

Episode

2006 - Studio 60 on the Sunset Strip

S01E05 The Long Lead Story

During cast rehearsals with Lauren Graham and Sting, a reporter attempts to get the real story on Matt and Harriet. Meanwhile Jordan passes on a tasteless new reality series. themoviedb

  • Posterrak

  • Backdrops

  • Esteka interesgarriak

  • Trailerrak

Argitalpen izena